Radioactive Contamination Discovered in Nuclear Reactor Plenum, Raising Safety Concerns
The TMI-2 reactor's plenum was removed in 1985 for refueling, and contamination levels were measured using dosimeters to estimate personnel dose rates. The goal was to accurately calculate dose rates during plenum removal. The plenum was moved to the refueling canal for storage underwater.