New construction scheme solves installation problems at Daqing Gas Turbine Power Plant.
The article discusses how to solve problems with installing heating surface modules in the No.2 boiler at Daqing Gas Turbine Power Plant. The researchers proposed a construction scheme that includes using temporary support drums and specific installation procedures. This helps in selecting cranes, removing roofing cover-boards, and reinforcing temporary drums.