New method raises reservoir flood control levels, increasing multipurpose effectiveness.
A new method based on probability theory was used to improve reservoir stage operation for flood control. By applying this method, the water level for flood control at the end of the flood season can be raised by up to 1.80 meters, leading to a significant increase in the reservoir's effectiveness. This approach can help optimize flood control operations for existing reservoirs.