New suspension bridge design revolutionizes wind resistance and durability.
The TongSheng Lake Suspension Bridge was designed with a main span of 150 meters, using a B/L ratio of 1/40 and H/L ratio of 1/200. The bridge's design, construction, wind resistance, and rust prevention were discussed in the study. The researchers found that the bridge's design and construction were reasonable, and they addressed wind resistance issues by using an appended-suspension method.