Wet FGD System Upgrade Slashes Energy Costs, Boosts Efficiency for Power Plants
The GGH device in the FGD system of Guangdong Jinghai Power Plant was getting clogged often. To fix this, they changed the demister from two flat layers to two roof layers and one tubular layer. This change helped the system run better and saved a lot of energy.