Massive Power Plants Adopt Groundbreaking Heat Exchanger, Boosting Efficiency and Reducing Emissions
A new type of heat exchanger was installed at Huaneng Yuhuan Power Plant to improve their desulfurization system. It was the first time this kind of heat exchanger was used in a 1,000 MW unit. The project faced challenges, but solutions were found, allowing the main unit and desulfurization system to operate together successfully for 168 hours.