Outdated Calculation Formula for Water Transfer Projects Leads to Significant Errors.
The researchers studied how to accurately calculate the flow at a weir sluice in water transfer projects. They found that the traditional method of using a specific ratio to determine flow patterns was not accurate for long-distance projects. By analyzing experimental and theoretical data, they developed a new formula to calculate discharge flow at the weir sluice under specific conditions.