New technique controls settlement of bridge foundations, saving time and money.
The paper discusses a method called post-grouting for controlling settlement in bridge pile foundations. This technique involves injecting material into the ground around the piles to prevent excessive sinking. The researchers highlight that post-grouting at the base of the piles is a simple, cost-effective, and practical way to control settlement effectively.