Building precooling slashes peak cooling costs by 25%, saving thousands monthly.
A cooling strategy was tested in a large office building to reduce peak cooling needs. By precooling the building before peak times, the strategy successfully limited the peak load to 75% of capacity, saving money compared to buying an extra chiller unit. The cost of installing an additional chiller was estimated at 25,000 per month during peak cooling season. The approach was tested on two identical buildings, with the one using precooling operating more efficiently than the other.