New mining method slashes spoil handling costs in steep Appalachian terrain.
The researchers studied the costs of handling and reclaiming spoil at a surface mine in Virginia. They looked at how much it cost to move the waste material from mining, comparing different areas of the mine. They found that the average cost of handling spoil was 0.08 to $0.20 per cubic yard. The study aimed to develop better methods for estimating these costs, which are important for planning how to restore the land after mining.