Bridge-widening project in Florida eases traffic congestion and boosts connectivity.
The article talks about how the construction industry is always looking for new ways to work together better on projects. Even in traditional projects, teams can still cooperate well and get great results. For example, a $31 million project in Orange Park, Fla., widened a bridge to help with traffic. The bridge had twin spans that were causing traffic jams because the area was growing fast. The project added two lanes to the bridge, making it six lanes wide like the roads on either side. The project also included fixing up the roads nearby. Overall, the project was about 1.5 miles long.