Wivenhoe Bridge dismantled for reuse, setting eco-friendly construction precedent.
The article talks about how the Wivenhoe Bridge was built and taken apart. When the Wivenhoe Dam was being planned in the 1960s, they wanted to make sure that if the bridge had to be submerged, they could reuse as much of it as possible. The dismantling of the bridge happened between May and August 1983.