New design method boosts safety and efficiency of precast I-girders
Partial prestressing is better than full prestressing for designing precast I-girders. These girders are typically 18-28 meters long. The study looked at how to design a connection of these girders under live load. Applying partial prestressing criteria to the design of the connection is beneficial.