New model predicts high school construction duration, saving time and money.
The goal of the study was to create a model that accurately predicts how long it will take to build a high school building. The researchers collected data from actual construction sites in Incheon and used it to develop a formula for estimating the time needed for different construction phases. By adding working days to non-working days based on historical weather data, the total construction duration can be calculated more accurately.